Leave Your Message
Three way valve renovation (no disassembly and verification required) cases

Three way valve renovation (no disassembly and verification required) cases

220kV substations in Taizhou, Ningbo, and Shandong

220kV substations in Taizhou, Ningbo, and Shandong

2026-06-24

Taizhou 220kV Jiaoxia Substation, Ningbo 220kV Yiting Substation, Shandong Jining 220kV Keyuan Substation and other Pinggao ZF11-252 GIS switchgear combined with circuit breaker chamber SF6 density relays are equipped with online verification three-way valves.

view detail
Shaoxing ± 800kV Jinhua Converter Station

Shaoxing ± 800kV Jinhua Converter Station

2026-06-24

Install online calibration three-way valves on the SF6 pipelines of the converter transformer sleeves at ± 800kV Jinhua Converter Station and ± 800kV Shaoxing Converter Station.

view detail
Shandong Linyi 220kV Muling Substation

Shandong Linyi 220kV Muling Substation

2026-06-24

Shandong Linyi 220kV Muling Substation, Dongying 220kV Guangli Substation and other Taikai ZF16-252 GIS switchgear combined with circuit breaker gas chamber SF6 density relay have been upgraded with online verification three-way valves.

view detail
Taizhou 220kV Shenggu Substation

Taizhou 220kV Shenggu Substation

2026-06-24

Installation of online calibration three-way valves for ABB-HPL245B1 GIS switchgear at Taizhou 220kV Shenggu Substation, 220kV Sha'ao Substation, and Datong 220kV Kaiyuan Road Substation.

view detail
PetroChina 110kV Puxian Substation

PetroChina 110kV Puxian Substation

2026-06-24

ABB ELK-04 GIS switchgear for PetroChina 110kV Puxian Substation, 110kV Yangqu Substation, 110kV Zhengzhou Station, etc., combined with SF6 online monitoring and installation of online calibration three-way valves.

view detail